Near-Bit Gamma Service Case C
2023-10-13
The bottom hole environment of this shale gas well is very complex, with significant vibration and severe drag pressure. Before HTWB take over the job, the third section has been POOH for 18 times because of instument failure provided by 6 different supplier with 6 different brand of worldwide near bit system.
With only two drills, 6.75”HT-NBM successfully complet the job and operate for 380hrs, TD at 5350m.