Case Study-RSS for Verti-Drilling
2023-12-08
Well background and Challenges
Location: Qinghai Delingha, Holesize: 8-1/2”
Date: July 2023
Customer objective was to bing hole the vertical and drill to TD (From 319m to 2350m)
Challenge: long vertical section with large dip angle and inclined formation
HTWB Solution
Selected VertiDrill RSS tool with real time S&V monitor
Results achieved
Location: Qinghai Delingha, Holesize: 8-1/2”
Date: July 2023
Customer objective was to bing hole the vertical and drill to TD (From 319m to 2350m)
Challenge: long vertical section with large dip angle and inclined formation
HTWB Solution
Selected VertiDrill RSS tool with real time S&V monitor
Results achieved
After took over, reduce Inc from 0.9 to 0.2 degree very soon and control of the Inc less than 0.4 to TD, which was far better than well plan requirements.