Case Study-RSS for Exploration well

2023-12-08

Well background and Challenges
Location: Hailar, Holesize: 8-1/2”Date: Sep 2023
Challenge: Abrasive and hard formation, extreme high S&V
Bit dull More trips for POOH change Bit 
HTWB Solution
Optimized BHA with RSS system, real time S&V monitor 
Results achieved
One sidetrack, well TD as per of company order